We performed electro-installation and civil works in Belgrade, as well as putting into work a double underground cable line 2x110 kV. The biggest part of these works...
We performed electro-installation and civil works in Belgrade, as well as putting into work a double underground cable line 2x110 kV. The biggest part of these works...
Elektromreza commissioned us to do the procurement, equipment delivery, electro –installation and civil works with the functional testing of the equipment and putting...
We were commissioned by Elektromreza Serbia to do the procurement, equipment delivery, electro-installation, civil works and conduct a functional testing of equipment...
We were commissioned by Elektroprenos Bosnia and Herzegovina to prepare the project documentation, do the procurement and conduct the works on the overhead line 110kV...
We were commissioned by MEPSO Macedonia to deliver equipment and build a transmission line 2x110kV and 20km long, and simultaniosly build 2x110kV cable line 1 km long...
Elektroprivreda Serbia was the investor for the project in which we installed OPGW cable with appropriate equipment, prepared the necessary documentation and...